We have started the foundation. Dug out the four corners and installed 1m X 1m concrete footings with rebar framing. The containers are designed to carry all of their vertical load at the corners which makes them able to be stacked up to 9 containers high. We plan to dig out the material under the container just enough to deter bugs and let air pass through to help with temperature and moisture.